Design & development
Tech packs, pattern making and fit corrections, versioned in one place.
- Tech pack
- Graded patterns
- Fit notes
The fashion production workspace
Managed by fashion designers, powered by a platform that brings everything together in one place.
Production · Spring drop
Product files
3
Units
660
On schedule
Yes
Oversized hoodie
180 units
Boxy tee — 3 colours
420 units
Technical legging
60 units
Fit corrections logged — sleeve length and shoulder drop updated on the pattern.
Start production
To talk with us, fill in your details and we'll come back with what it costs and how long it takes. If Rook isn't the right fit, we'll say so.
The platform
Most brands lose time in the gaps between a designer, a factory and a freight forwarder. Rook removes the gaps by running every stage in one place, with the output of each stage feeding the next.
Tech packs, pattern making and fit corrections, versioned in one place.
Proto to pre-production samples, with every round documented against the brief.
Bulk manufacturing with inline quality checks tied to your approved sample.
International shipping by sea or land.

Why brands choose Rook
Garments are still made by people who know how fabric behaves. Rook gives those people better information — and gives you a clear view of what they decided and why.
Start from 60 units per style. Validate a drop with real garments instead of committing capital to a warehouse of unsold stock.
No stitching together a pattern maker, three factories and a freight broker. Rook owns the whole chain and answers for all of it.
Every sample round, cost change and delay lands in your workspace with a timestamp, so nothing is buried in a chat thread.
Freight and customs are planned alongside production, not bolted on at the end when margins are already set.
Capabilities
Categories we produce regularly, with the construction and finishing that each one demands.
The process
A typical programme runs 12 to 14 weeks. Select a stage to see what happens and what you receive.
We map your product, target cost and launch window into a concrete plan. You leave knowing what is realistic and what it costs.
Selected work
Programmes taken from first pattern through to delivered stock.

Heavyweight fleece programme with garment dye and dropped-shoulder construction.

Boxy garment-dyed jersey line, developed from first pattern to EU delivery.

Technical stretch styles with flatlock seams and performance finishing.
Questions
Production starts from 60 units per style. Colourways within a style can often be split, which we confirm during your production brief.
Typically 12 to 14 weeks from approved brief to EU delivery. Sampling is usually the variable — timelines tighten when your tech pack is ready and fit feedback is quick.
Yes. Many brands arrive with sketches, mood boards or a garment they want to develop from. Pattern making and tech pack creation are part of what Rook does.
Yes. Freight and customs documentation are planned during production, so landed cost is known before you commit to bulk.
It reads the production record — samples, costings, mill lead times — and surfaces cost, timeline and recurring quality patterns. Every recommendation is reviewed by the production team before it reaches you.
You do. Your designs, patterns and tech packs remain yours, and are available to export from your workspace.